Thank you all for the high interest in ATS concrete towers.
booth 1
booth 2
(28.04.2010) visit of group of italian students

new job offers: have a look!
25% energy production increase with ATS hybrid tower
After feeding in green energy since April 2009, ATS has been performing an energy production increase calculation and measurement program with the following extraordinary results:
Having compared a similar WEC producing at 100 m hub height, the ATS hybrid tower generates 25 % more energy at a hub height of 133 m.
This is much better than the initially expected 18%, as we calculated before having these measurement results.
The increase of 25 % is clearly an achievement of the favourable wind conditions at higher hub heights.
You can achieve similar performance with your projects and WECs by combining them with ATS hybrid towers.
ATS is offering the basis for higher performance to every manufacturer.
November 2009: nomination for the Dutch Award "Betonprijs 2009"
- three of the 42 are nominated in the category "Concrete and Society"
14.11.2009: ATS Hybrid Tower in " De Ondernemer"
(print) (web)
06.11.2009: new article about ATS Hybrid towerEize de Vries, Renewable Energy World, September-Oktober 2009
26.05.2009: HUSUM Wind Energy Award 2009 nomination, Berlin
14.05.2009: The official ceremony of grid-connection
04.-07.05.2009: Windpower Chicago